I’m calling this post my quote. I think it will be an interesting test to see how close we end up in comparison to expectations.
Demo
- Remove old tile and backboard down to the studs, go all the way to the ceiling
- Remove old tub and disassemble fixtures and drain
- Remove old flooring
- Pull existing baseboards
- Toilet and sink cabinet removed at a later date
Install
- New tub and drain
- Access panel behind drain (current CA plumbing code)
- Backer board shower surround (1/2 inch), include vapor barrier
- New copper pipe and faucets as needed, no change to shower height
- Tile tub
- Backer board floor
- Tile floor
An inquisitive person reading this is probably thinking, what about the painting, how about the sink, are you going to change the medicine cabinet and mirror? Frankly, I don’t know. For now, I’m going to treat it as a separate project even though it will take longer over all to get everything done.