Project Scope

I’m calling this post my quote. I think it will be an interesting test to see how close we end up in comparison to expectations.

Demo

  • Remove old tile and backboard down to the studs, go all the way to the ceiling
  • Remove old tub and disassemble fixtures and drain
  • Remove old flooring
  • Pull existing baseboards
  • Toilet and sink cabinet removed at a later date

Install

  • New tub and drain
  • Access panel behind drain (current CA plumbing code)
  • Backer board shower surround (1/2 inch), include vapor barrier
  • New copper pipe and faucets as needed, no change to shower height
  • Tile tub
  • Backer board floor
  • Tile floor

An inquisitive person reading this is probably thinking, what about the painting, how about the sink, are you going to change the medicine cabinet and mirror? Frankly, I don’t know. For now, I’m going to treat it as a separate project even though it will take longer over all to get everything done.

Leave a Reply

Your email address will not be published. Required fields are marked *